GREENWOOD TOWNSHIP CONDITIONAL USE /
COMMERCIAL CONDITIONAL USE RESORT 5 YEAR PLAN /
PLANNED UNIT DEVELOPMENT CHECKLIST


** ALL ITEMS BELOW MUST BE CHECKED OFF IN ORDER TO
APPROVE/PROCESS ANY OF THE ABOVE APPLICATIONS:

__________ Ownership information including physical address of site plus mailing
address/phone number
__________ Complete legal description from your deed, including all parcel(s)
involved in the development
__________ Verification with St. Louis County Auditor that Real Estate Taxes are
paid up to date
__________ Lot Size including shoreline, depth and acreage, location of any
wetlands. Accuracy is important!
__________ Density Calculations for entire project - Accuracy is important!
__________ Zone District with Requirements (Planning Director can assist with this
information)
__________ All existing structure sizes including height
__________ Complete Narrative of project plans with anticipated dates for completion
__________ Signage, lighting plans with location of signs and lights with type of
lighting included
__________ Screening Plans (Native vegetation, berm, fence, wall)
__________ ST. LOUIS COUNTY HEALTH documentation of approved septic plans
& water plan (if required)
__________ MPCA (MN Pollution Control) documentation (if required)
__________ EAW (Environmental Assessment Worksheet) or EIS (Environmental
Impact Statement) if required
__________ SWCD (Soil & Water Conservation District) plans to manage erosion,
stormwater & runoff plans
__________ DNR Division of Waters for mooring, docking and other shoreland
activity plans
__________ GREENWOOD FIRE DEPARTMENT approval of driveway/road plans
& any other fire safety issues
__________ ST. LOUIS COUNTY PUBLIC WORKS approval of ingress/egress
locations
__________ ST. LOUIS COUNTY HEALTH approval if application includes
Food/Beverage Service
__________ COMPLETE TO SCALE Diagram of proposed site including all exterior
building sizes & heights, with their locations to ALL lot lines, driveway
and parking areas with setbacks, location of any gas/oil tanks
and pumps with setbacks, septic system as well as expansion areas
with all setbacks, well location, lot coverage & open space calculation
in percentage in accordance to maximum allowable impervious surface
__________ Supporting information from the Greenwood Ordinance regarding
this request
__________ If all above information is found acceptable to the Planning Director,
Applicant shall supply 15 copies of all of the above prior to
final acceptance.
__________ Sign the application and attach a check for the fee



Home Page!

Home Page | Board Members | Board Minutes | Current Events | Calendar | Town Hall
Planning & Zoning | Maps | Fire Department | Local Businesses | Other Information

Greenwood Township 3000 County Road 77
Tower, MN 55790 Phone: 218-753-2231
greenwoodtownship@frontiernet.net